Wiring a 1940s house in Denver, I went with armored cable instead of conduit for the first floor.
The BX saved me about 8 hours of labor on that job and the inspector had zero issues with it. Anyone else find certain older methods are actually more practical for specific renos?
3 comments
Log in to join the discussion
Log In3 Comments
thomas27517d agoMost Upvoted
That Denver inspector's approval is a solid data point. Honestly, I've seen BX get flagged for bonding in some older jurisdictions. Was there any prep needed on the cable ends to meet local code?
4
uma40917d ago
Tbh we had to add bonding bushings on our last retrofit. Denver's been pretty chill about it lately though.
2
hannah42216d ago
Guess @uma409's inspector was having a good day for once.