Can we talk about the 14 minutes a day our layout guy got back from a $60 laser measure?
He was doing tape pulls solo on a remodel in Boise and I timed him for a week, then handed him a cheap green beam unit and his layout setup time dropped by about 14 minutes a shift. Anyone else actually measured the time a tool saved instead of just guessing it felt faster?