That Thursday when our whole framing crew lost 6 hours to one bad chalk line and it made us better
Last Thursday on a two story build out in Clovis we lost almost 6 hours because one guy snapped a line off a mark that was an inch off. We didn't catch it until the subfloor plates were already down and the walls started stacking crooked. The lead carpenter called a full stop around 10am and we pulled everything apart. Nobody was mad about the rework, what got me was the 20 minutes after where he made every guy re-verify the corners with a string and a tape before we touched another board. Our layout has been dead on since then because we built a two person check into the routine. I'm now a hard believer that one guy measuring solo is how buildings go bad. We lost a day of pay that week but the walls went up plumb the second time and inspection passed first try. What's your crew's rule for double checking layout before things get nailed down?