Shoutout to the guy in Toledo who told me to stop overbuilding my stairs
I've been adding extra stringers to every set of deck stairs for years because my first boss told me it was the safe way. Last month a framer named Rick watched me lay out a 6 foot wide set on a job in Toledo and asked why I had three stringers when two would hold it fine. He pulled out the span table and walked me through it, and I felt pretty dumb standing there with my extra boards. Now I'm wondering how much lumber I've wasted over the years, anyone else get stuck on one habit from a former boss?