Saw a crew framing a garage in Cedar Rapids using a chalk line for wall plates
Stopped by a build site in Cedar Rapids last Tuesday to drop off some lumber. The crew was snapping chalk lines on the concrete for their bottom plates instead of measuring each one. They said it saves them about 15 minutes per wall and keeps the plates dead straight. I usually just measure and mark, but this looked way cleaner. Anyone else switch to chalk lines for layout like that?