I finally stopped framing walls one at a time and it cut my build time by 3 days
I was building a 24x30 garage out in Aurora and kept framing one wall flat, tipping it up, then bracing it before moving to the next like I always do. After two days I had 3 walls done and my back was wrecked, so I said forget it and started framing all the walls flat on the deck, sheathing them too, then tipping them up as a group with two guys on the plates. We had the whole shell standing by Thursday and square within an eighth, which I honestly didn't expect since I always thought assembling everything first would throw my lines off. It feels wrong at first because you're working flat when you're used to fighting gravity, but the speed is real. Anyone here frame sheathed walls in a stack like that, and did you run into any issues with the plates twisting before you got them braced?