Showerthought: the tech who trained me in Fresno said never trust a panel's zone list, and man
He said go tone out every zone by hand on the first service call, no matter what the paperwork says. Took me 40 minutes extra on a 16 zone job last week and I found two zones swapped at the keypad that nobody labeled right. How often do you all re-walk zones on a takeover panel versus just trusting the old list?