Saw a repair bench in Columbus with 14 monitors stacked on one power strip
I stopped by a shop in Columbus last month to pick up some spare RAM and the tech showed me his bench setup, which had 14 monitors and 3 bench power supplies all fed from a single cheap power strip under the desk. He shrugged and said it had been running like that for two years without a trip, which honestly made me nervous just standing there. How do you all handle power distribution on a busy bench, one strip per zone or something heavier duty?