Can we talk about whether it's worth pulling up tack strip on a 20 year old stretch job or just going over it
Had a job in Dayton last month where I pulled the old strip and found the concrete spalled so bad I burned 6 hours patching before I could even start. The other side of it is my buddy who leaves the old strip, staples right into it, and swears he's never had a callback in 15 years of doing it that way. Where do you all land on this one, is pulling strip always the right move or is it just eating time on jobs that don't need it?