A foreman in Dayton set my framed wall on the slab 3/4" off and made me redo the whole layout
I was running a 24 foot wall solo at a job site off Siebenthaler Ave and rushed the chalk line, and the foreman caught it before we stood it up. He made me break the plate apart and re-snap instead of nudging it, which cost me an hour and a half. Now I snap every line twice and check corner to corner with the tape before a single stud goes down. Does anybody else have a layout habit that feels slow but saves your hide?